I

Rectification Of Reception Area AC Issues - RD

Iskaan Tech

dubai, dubai emirate, United-Arab-Emirates Full-time June 28, 2026
Apply Now

Vacancy Description

Rectification Of Reception Area AC Issues - RD

Break Down Posted On: June 24, 2026 Closing On: July 2, 2026

JOB REFERENCE: JB

The reception area HVAC system has been experiencing inadequate cooling and operational deficiencies, resulting in occupant discomfort and reduced system performance. A detailed inspection of the Fan Coil Units (FCUs) identified multiple mechanical and control-related faults affecting the overall efficiency of the air conditioning system.

FCU Unit 1 was found to have two faulty fan motors requiring replacement, a defective thermostat, and several ducting defects causing improper airflow distribution. Additionally, the unit requires comprehensive servicing due to reduced cooling capacity and operational inefficiencies.

FCU Units 2 and 3 also require major servicing as a result of diminished cooling performance. Inspection revealed two faulty actuator valves, defective thermostats, and ducting deficiencies impacting...

Ready to Apply?

अभी आवेदन करें

Submit your application for Rectification Of Reception Area AC Issues - RD at Iskaan Tech

Apply for this Position