Vacancy Description
Scope Summary
The Willow project is spread over several phases and areas.
2023 – 2025 - Detailed Design
2023 – 2024 - WOC Fabrication
2025 – 2027 - WOC North Slope Installation and Commissioning
2025 – 2027 - WCF / DS Sealift Module Fabrication
2027 – 2029 – WCF / DS North Slope Installation and Commissioning
Willow will be a greenfield design including all processing facilities, utilities, drilling equipment, camp, and power generation.
JOB DETAILS
- This position will support the Willow Project organization, by providing safety oversight for assigned work scopes.
- Work scopes are primarily focused on ice roads, temporary infrastructure, gravel hauling operations, commissioning, facility module installation and operation, and pipeline installation.
- Work location will be on the North Slope with an office and lodging at a large field camp, typical work shifts are either 2 x 2 or 3 x 3.
The Willow project is spread over several phases and areas.
2023 – 2025 - Detailed Design
2023 – 2024 - WOC Fabrication
2025 – 2027 - WOC North Slope Installation and Commissioning
2025 – 2027 - WCF / DS Sealift Module Fabrication
2027 – 2029 – WCF / DS North Slope Installation and Commissioning
Willow will be a greenfield design including all processing facilities, utilities, drilling equipment, camp, and power generation.
JOB DETAILS
- This position will support the Willow Project organization, by providing safety oversight for assigned work scopes.
- Work scopes are primarily focused on ice roads, temporary infrastructure, gravel hauling operations, commissioning, facility module installation and operation, and pipeline installation.
- Work location will be on the North Slope with an office and lodging at a large field camp, typical work shifts are either 2 x 2 or 3 x 3.
Ready to Apply?
अभी आवेदन करें
Submit your application for HSE Specialist III at Airswift
Apply for this Position